OCTOBER 2016
The Association of Nippon Koei with DevCon and ACE has signed the contract with Civil Aviation Authority of Bangladesh (CAAB) to conduct a feasibility study on the proposed Bangabandhu Sheikh Mujib International Airport. The Contract period will be 18 months from starting from October 2016.