Case Studies

We are a young and creative company and we offer you fresh business ideas for your team and company.
bt_bb_section_bottom_section_coverage_image
dms-1
dms-2 (1)
dms-3
PROJECT DESCRIPTION

The DMS consultant will assist the PMU in managing and implementing the Project, assisting the PMU and Project Coordination Unit (PCU) in design review and supervising all works under packages of distribution network improvement (DNI), liaising with ADB, procuring goods and works under the Project, reviewing detailed design carried out by contractors, handling financial management of the Project, and monitoring safeguards compliance of the Project

KEY SERVICES

Project Management

  1. Assisting PMU by delineating its method of working, procedures, and reporting;
  2. Assisting PMU in procuring goods, works and services in accordance with ADB Procurement (2015, as amended from time to time);
  3. Establishing criteria for supervision, coordination, and management,
  4. Strengthening PMU/PCUs capacity for improved financial, institutional, and operational management of services

Survey, investigation and technical design of five contract packages 

  1. Review the detailed design and drawings, particularly the network analysis (by software), and provide changes as required, including all pipeline analysis, values, bulk meters and other electro-mechanical equipment.

Construction supervision

  1. General and detailed supervision of all construction and maintenance works including pipeline construction, valves, bulk meters and other equipment installation and establishing DMA systems.
  2. Preparation of construction management manual, quality assurance manual and other certificates and reports
  3. Supervise of daily basis, ensuring proper testing and quality control of pipelines and DMA performance.
  4. Assist in pressure testing, pressure system testing of all laid, relined and burst water mains suitable segments of relined mains with new service connections.
  5. Updating the GIS database by recording all existing facilities

Capacity building and trainings

  1. Assistance with training of DWASA personnel based on operation and maintenance routines. Assist in developing training programs for DWASA zonal staff on operations and maintenance of networks, maintaining operational pressure, identifying sources of wastage, flushing lines, service connection procedure, etc.
  2. Monitoring training impact and resulting performance improvements
  3. Assisting DWASA to maintain the GIS database and providing hands-on training to utilize it.

Safeguards

  1. Ensuring mitigation of all environmental issues and appropriate actions on social and gender issues;
  2. ensure contractors (including their sub-contractors) plan, design, construct and operate the facilities in compliance with ADB SPS and government regulations
  3. Supervising the NGO in Resettlement Plan implementation and monitoring of Environmental Management Plan

Reviewing the DWASA Gender Strategy and assist in improving and its operationalizing.

PROJECT VALUE
US$ 8.3 million
SECTOR
Water & safeguards
CLIENT
Dhaka Wasa
dncc-1
dncc-2
dncc-3
PROJECT DESCRIPTION

  • Improvement of Different Damaged Road Infrastructure including Drains and Footpath Construction under Dhaka North City Corporation
  • To implement the abovementioned project smoothly and effectively, DNCC now engages a consulting firm for the Design Review, full time supervision during construction period and As-Built Drawing preparation purpose of the ongoing civil works under the project. The infrastructure improvement work includes the following components:
    – Road construction- 204 km (approx.)
    – Drainage (open/pipe)- 267 km
    – Footpath Facility- 119.27 km

KEY SERVICES

  • Full-time supervision and monitoring of construction works for ensuring quality and progress
  • Proper documentation of field work such as site order book, keeping records
  • Preparation of monthly and quarterly progress reports
  • Review of design and drawings of works
  • Preparation of As-built drawings and Project Completion Report (PCR) along with all documents

PROJECT VALUE
US$ 450,219
SECTOR
Infrastructure
CLIENT
Dhaka North City Corporation (DNCC)
mohakhali_flyover_1
mohakhali_flyover_2
mohakhali_flyover_3
PROJECT DESCRIPTION

  • Design review, Detailed design Supervision and Monitoring services for DUTP
  • Included 2 Flyovers- Mohakhali flyover (1020m) and Jatrabari flyover (7km including loops and ramps), a PC Girder Bridge (on river Turag), 9 Pedestrian over bridges, modern traffic signal system at 59 intersections, 3 inter-district Bus Terminals etc.

KEY SERVICES

  • Carry out engineering surveys and investigations
  • Review of designs, Detailed Engineering Designs of all new infrastructure facilities and redesigns of flyover at Mohakhali under the project
  • Preparation of Environment Management Plan (EMP) and Resettlement Action Plan (RAP
  • Contract administration, Construction supervision
  • Institutional support

PROJECT VALUE
US$ 11.28 million
SECTOR
Transport
CLIENT
Greater Dhaka Transport Planning and Coordination Board
p3
dhaka_tongi_rail-3
dhaka_tongi_rail-2
PROJECT DESCRIPTION

  • Construction of 48.80 km DG new Rail Track (Main line≈45.00 Km. & loop & sidings≈ 3.80 km) parallel to existing rail track from Dhaka to Tongi
  • 12.28 km DG rail track (Main line≈11.28 Km & loop & sidings≈1.00 km) parallel to existing rail track from Tongi to Joydevpur including Signaling and other allied works

KEY SERVICES

  • Developing systems and procedures, making all engineering decisions required for the successful and timely implementation of the construction contract, Project Planning, Project coordination, Project interfacing or linkages using Project Management Software
  • Supervision of all construction work in accordance with drawings, sequence and specifications embodied in the contract document.
  • Making all necessary measurements and certify payments as per standard format.
  • Ensuring compliance to all safety requirements while the work is in progress
  • Project monitoring for the implementation of the Project up to commissioning of the project or/and the end of the defect liability period
  • Testing of complete signalling installation as per various provisions in the codes, manuals and Railways instructions
  • Preparation and submission of monthly, quarterly and other reports
  • Provide technical guidance to the contractor and Conduct regular monitoring of environmental quality (air, water, noise, soil) in and around the construction site
  • Inspection and checking the infrastructure developed under the project to ensure whether any defect(s) or discrepancy has been noticed during Defect Liability Period.
  • Advise and guide the Client in regard to materialize the rectification to be made by the contractor in case of any defect(s) noticed under the clause concerned
  • Developing systems and procedures to administer the construction contracts and ensure that the contractual requirements, with respect to both quality and quantity of work in accordance with the provisions of the construction contract.
  • Supervision of all construction work in accordance with drawings, sequence and specifications embodied in the contract document
  • Ensuring compliance to all safety requirements while the work is in progress.
  • Testing of complete signalling installation as per various provisions in the codes, manuals and Railways instructions as followed by BR and recording of complete testing data and submission the same to the client.
  • Preparation and submission of monthly, quarterly and other reports as per formats developed by the Consultant and approved by the Client, required for management of the project and reporting to different controlling authorities.
  • Provide technical guidance to the contractor and Conduct regular monitoring of environmental quality (air, water, noise, soil) in and around the construction site and maintain records for the same

PROJECT VALUE
BDT 44.37 million
SECTOR
Transport
CLIENT
Bangladesh Railway