PROJECT DESCRIPTION

The Government of Bangladesh (GOB), through Roads and Highways Department (RHD), received an ODA Loan from Japan International Cooperation Agency (JICA) to Finance the Detailed Engineering Design, Construction Supervision of Eastern Bangladesh Bridge Improvement Project and Capacity Building of RHD.

The scope of the project consists of the Detailed Engineering Design and Construction Supervision of total 68 nos. of bridges to be constructed/ reconstructed in the eastern part of the country i.e. Zones of Dhaka, Sylhet, Comilla and Chittagong; of lengths ranging from 38m to 170m and structure types of PC Girder, RCC Girder and Composite. Approximate number and total lengths of bridges in each

KEY SERVICES

  • Detailed Engineering design – carrying out reconnaissance survey, topographic surveys and hydrographic surveys, sub-soil investigation; preparation of detailed design, BOQ, technical specifications (Dhaka zone 18 nos., Sylhet zone 18 nos., Comilla zone 10 nos. and Chittagong Zone 22 nos. and bidding documents for total 68 bridges),
  • Pre-construction stage – assist RHD with Land Acquisition and Resettlement Works, Contract Administration and selection of contractors,
  • Solving any contractual matters related to the construction works and proper execution,
  • Furnishing all necessary ground and topographic data to the contractor for establishment of road alignment and grades,
  • Review and recommendation for approval of contractor’s work schedule, assess the adequacy of materials, labor and equipment, housing, shops and warehouses according to the condition of contract
  • Supervised shifting and relocation of utility lines (11 KV Electrical lines and pole, Light poles, Communication cables etc.)
  • Supervision of the works and to issue the instruction to the contractor as required
  • Examination of and recommendations for contractor’s time extension, extra compensation; check, certify and make recommendation to RHD on Contractor’s monthly and final payment certificate
  • Issuance of the certificate of project completion
  • Capacity Building
  • Improvement of Bridge Inventory / Condition Survey Manual and Bridge Condition Survey (BCS) Forms
  • Implementation of Bridge Condition Survey in RHD Road Network for 3,827 nos. of bridges;
  • On the Job Training (OJT) on BCS to RHD Field Staff;
  • Establishment of Bridge Maintenance Standard and Bridge Maintenance Manuals;
  • Preparation of Bridge Inventory/Condition Survey Report; Materials for preparation of Bridge Maintenance Needs Report; Updating of latest Bridge Database, Bridge Maintenance Management System-BMMS (partly); andTraining of RHD Headquarter Staff.

PROJECT VALUE
US$ 6.725 million
SECTOR
Transport
CLIENT
Roads & Highways Department (RHD)
pmb-1
pmb-2
pmb-3
PROJECT DESCRIPTION

The main bridge is a two level steel truss superstructure with road traffic on the upper level and rail on the lower level acting compositely with a pre-stressed reinforced concrete deck slab. The main tasks and activities of the Construction Supervision Consultants (CSC), covering the pre-construction, construction and post construction stages of the Main Bridge and River Training Works would include, but not limited to, the following: Design Review and others Requirements; Preparation of Project Implementation Plan; Project Management; Construction Supervision; and Project Completion/Closure Activities Specifications: Total Length = Approximately 6.15km (41 Spans of 150 m each), founded on 42 nos. of piers comprising 3m driven steel tubular or cased bored piles (of depth 100m – 115m), The superstructure has two level fabricated steel truss composite with a pre-stressed concrete upper deck slab. 4 lanes are on the upper level and single track rail line on the level below. The bridge also comprises of a major river training works both North (1.6 km) and South (12 km) bank. The upper deck steel truss (6.15km) is of Warren Type with a typical panel point spacing of 18.75m longitudinally. It is 13.5m wide and 12.7m deep which, combined with a 22m wide composite deck slab, makes a total depth of 13.6m. The members of the steel truss are typically welded rectangular hollow sections formed by steel plates, with thickness varying from 29mm to 70mm. The warren steel truss is considered to be corrosion resistant and considered as compatible as weathering steel. The road and rail viaducts at each end of the main bridge are spanned 38m each comprising precast pre-stressed concrete beams composite with cast in situ reinforced concrete piers supported by reinforced concrete bored piles.

KEY SERVICES

  • Design Review and others Requirements.
  • Preparation of Project Implementation Plan.
  • Project Management.
  • Construction Supervision.
  • Project Completion/Closure Activities.

PROJECT VALUE
US$ 48.62 million
SECTOR
Transport
CLIENT
Bangladesh Bridge Authority (BBA)
KTP1
KTP2
PROJECT DESCRIPTION

The Government of the People’s Republic of Bangladesh (GOB) has entered into a memorandum of understanding (MOU) with the People’s Republic of China (PRC) to obtain financing towards construction of a tunnel under the river Karnaphuli in Chittagong. to be implemented by Bangladesh Bridge Authority (BBA). BBA has signed a contract (the Construction Contract) with the China Communications Construction Company Limited (the Contractor) for the design, manufacture, construction and commissioning of the tunnel with the approach roads, toll plaza, building services and electronic control systems and the GOB is now negotiating the Loan Facility Agreement. BBA thus engages a consulting firm(s) (the Consultant) to act as the Employer’s Representative (ER) under the Construction Contract to support its activities in all stages of the construction contract. This scope of services pertains to the works of the ER which includes detailed design, procurement, construction supervision, commissioning, testing and operation of the Construction Contract.

KEY SERVICES

The primary roles and functions of the ER/Consultant include but not limited to the following:

  1. Review of Contract Documents in compliance with the requirements of the Construction Contract,
  2. Detailed design and cost estimation of the tunnel and allied works,
  3. Review, inspection and monitoring of the construction works (temporary and permanent works),
  4. Assessment of geological, topographical, hydrological and environmental conditions at site,
  5. Review of the Contractor’s Quality Control System established under the Construction Contract and Employer’s Requirement especially on Environmental Protection,
  6. Review of the Contractor’s Environmental Management System,
  7. Review of the Contractor’s Site Safety Plan,
  8. Review of the inspection and test plans and results of the testing (plan materials and workmanship),
  9. Conducting the procedures required on behalf of the Client on Employer’s Taking Over and preparation of the Taking-over Certificate,
  10. Conducting procedures on behalf of the Client during the Defects Liability period and preparation of the Performance Certificate,
  11. Arrangement of Training as a specific component of the project:
    1. Overseas Training: 2 weeks’ training on contract administration, project management, PPP contracts, latest innovations in construction and maintenance of roads, bridges, river training works, asset management systems and sustainable maintenance in renowned instritutions of developed countries for 5 engineers/ professionals

Domestic Training: 1500 man-days’ training for 100 engineers and other BBA/PIU professionals on the above topics

PROJECT VALUE
US$ 37.01 Million
SECTOR
Transport
CLIENT
GOB (Govt. of Bangladesh)
caab_contract_sign_bsmia
airport1
PROJECT DESCRIPTION

  • To create a hub airport in this region and meet growing air traffic demand of the country
  • Development of infrastructure necessary to build a new modern International Airport and communication link (Expressway, Railway etc.) with the capital city Dhaka

KEY SERVICES

  • Assist in Study on all areas/ factors for selection of a site for construction of the full-fledged international airport; liaise with CAAB and other authorities
  • Assistance in Cost-Benefit & Risk-Benefit analysis and Economic and financial analyses, with Financing & Operation Strategy
  • Conduct Social assessment and prepare Initial Environmental Examination (IEE) report on 3 sites and Environmental Impact Assessment (EIA) and Environmental Management Plan (EMP) for the final location
  • Data collection and investigation through detail engineering surveys, soil investigation including present transportation system
  • Investigation and analyses of at least three alternative sites to select a suitable one for the proposed hub airport
  • Airport site selection and verification (for operation of Code 4F type Aircraft)
  • Geotechnical analyses for sustainability of Runway and associated Airfield Pavement
  • Assist in Air traffic demand forecast and route development plan
  • Assist in Access transportation plan with connectivity to the capital and other major existing road/ rail communication network
  • Assist in Airport operation strategy/ plan, Land use planning, Layout and phasing plan and facilities requirement analysis
  • Conceptual design of passenger terminal building and other facilities based on the glorious political life of Bangabandhu Sheikh Mujibur Rahman
  • Cost estimation for construction and operation & maintenance

PROJECT VALUE
US$ 0.563 million
SECTOR
Transport
CLIENT
Civil Aviation Authority Bangladesh (CAAB)
PROJECT DESCRIPTION

  • Construction of 4-Lane Highway from Daudkandi to Chittagong (Chittagong city Gate) Section of Dhaka-Chittagong Highway (N1)
  • Comprised 5 Major Bridges (total length 520 m), 3 Railway Overpasses (Flyovers) in Comilla (344.2m), Feni (86.4m) and Chittagong (53.9m), 17 Small Bridges (850 m), and 242 Culverts.

KEY SERVICES

  • Review and prepare revised design of the road alignment
  • Approve the contractor’s work program, method of statements, material sources, manpower and equipment deployment
  • Prepare and issue reports as defined subsequently
  • Make measurements and keep measurement records
  • Maintain records, correspondence and diaries
  • Assist the Engineer in maintaining consolidated project accounts and in preparing the financial statements
  • Certify completion of part or all of the works
  • Construction supervision

PROJECT VALUE
US$ 2.42 Million
SECTOR
Transport
CLIENT
Roads & Highways Department (RHD)
mohakhali_flyover_1
mohakhali_flyover_2
mohakhali_flyover_3
PROJECT DESCRIPTION

  • Design review, Detailed design Supervision and Monitoring services for DUTP
  • Included 2 Flyovers- Mohakhali flyover (1020m) and Jatrabari flyover (7km including loops and ramps), a PC Girder Bridge (on river Turag), 9 Pedestrian over bridges, modern traffic signal system at 59 intersections, 3 inter-district Bus Terminals etc.

KEY SERVICES

  • Carry out engineering surveys and investigations
  • Review of designs, Detailed Engineering Designs of all new infrastructure facilities and redesigns of flyover at Mohakhali under the project
  • Preparation of Environment Management Plan (EMP) and Resettlement Action Plan (RAP
  • Contract administration, Construction supervision
  • Institutional support

PROJECT VALUE
US$ 11.28 million
SECTOR
Transport
CLIENT
Greater Dhaka Transport Planning and Coordination Board
p3
dhaka_tongi_rail-3
dhaka_tongi_rail-2
PROJECT DESCRIPTION

  • Construction of 48.80 km DG new Rail Track (Main line≈45.00 Km. & loop & sidings≈ 3.80 km) parallel to existing rail track from Dhaka to Tongi
  • 12.28 km DG rail track (Main line≈11.28 Km & loop & sidings≈1.00 km) parallel to existing rail track from Tongi to Joydevpur including Signaling and other allied works

KEY SERVICES

  • Developing systems and procedures, making all engineering decisions required for the successful and timely implementation of the construction contract, Project Planning, Project coordination, Project interfacing or linkages using Project Management Software
  • Supervision of all construction work in accordance with drawings, sequence and specifications embodied in the contract document.
  • Making all necessary measurements and certify payments as per standard format.
  • Ensuring compliance to all safety requirements while the work is in progress
  • Project monitoring for the implementation of the Project up to commissioning of the project or/and the end of the defect liability period
  • Testing of complete signalling installation as per various provisions in the codes, manuals and Railways instructions
  • Preparation and submission of monthly, quarterly and other reports
  • Provide technical guidance to the contractor and Conduct regular monitoring of environmental quality (air, water, noise, soil) in and around the construction site
  • Inspection and checking the infrastructure developed under the project to ensure whether any defect(s) or discrepancy has been noticed during Defect Liability Period.
  • Advise and guide the Client in regard to materialize the rectification to be made by the contractor in case of any defect(s) noticed under the clause concerned
  • Developing systems and procedures to administer the construction contracts and ensure that the contractual requirements, with respect to both quality and quantity of work in accordance with the provisions of the construction contract.
  • Supervision of all construction work in accordance with drawings, sequence and specifications embodied in the contract document
  • Ensuring compliance to all safety requirements while the work is in progress.
  • Testing of complete signalling installation as per various provisions in the codes, manuals and Railways instructions as followed by BR and recording of complete testing data and submission the same to the client.
  • Preparation and submission of monthly, quarterly and other reports as per formats developed by the Consultant and approved by the Client, required for management of the project and reporting to different controlling authorities.
  • Provide technical guidance to the contractor and Conduct regular monitoring of environmental quality (air, water, noise, soil) in and around the construction site and maintain records for the same

PROJECT VALUE
BDT 44.37 million
SECTOR
Transport
CLIENT
Bangladesh Railway