The project aims to increase the water-borne sewerage coverage in Dhaka city. The project will prepare a sewerage project with STP and sewer network in Rayer Bazar catchment area, Dhaka.

pdf-3
pdf-2
p13
PROJECT DESCRIPTION

The project aims to increase the water-borne sewerage coverage in Dhaka city. The project will prepare a sewerage project with STP and sewer network in Rayer Bazar catchment area, Dhaka.

KEY SERVICES
  • Survey of the catchment area including topo survey, geotechnical investigation, field measurements and inspections.
  • Survey of the catchment area including topo survey, geotechnical investigation, field measurements and inspections.
  • Detailed civil/ structural and architectural design of sewerage treatment plant, sewer sections, sump and pump house, including electromechanical equipment.
  • On-site sanitation system design.
  • Preparation of BOQ including detailed design, estimates.
  • EIA.
  • Preparation of Detailed Project Report (DPR).
  • Preparation of contract document in Design, Built and Operate (DBO) format.
PROJECT VALUE
US$ 2.3 million
SECTOR
Water & Safeguard
CLIENT
Dhaka WASA funded by ADB