PROJECT DESCRIPTION
- This project has comprised of two components i) Construction of a new Port ii) Construction of a new Port Access Road. The Construction of new road component has located in Chakaria and Moheskhali Upazilas of Cox’s Bazar district in Bangladesh.
- Construction of 25.8 km long 4-lane Port Access Road on new Embankment
- Construction of 17 bridges
- Construction of 1.6 km long 4-lane Matarbari Port North-South Connector Road
- Soft Soil Improvement Works
KEY SERVICES
- Study of the engineering survey and soil investigation results for the execution of design
- Detail design of pavement sections
- Fixation of road alignment
- Assist in preparation of bid documents, bid evaluation and facilitation of pre-contract discussion and finalization of contract documents
- Construction supervision
PROJECT VALUE
US$ 5,721,350.96
SECTOR
Infrastructure
CLIENT
Roads & Highways Department (RHD)